Application Cases / Jiangxi Copper · Guixi Smelter

Jiangxi Copper · Guixi Smelter

Smart slag-pot management in production
IndustryNon-ferrous · Copper LocationGuixi, Jiangxi Year2026
01

Overview

Deployed in 2026, the system unifies smart tracking, cooling control and dispatch, cutting cooling cycles by 4%+ and eliminating explosion risks at the source.

02

Challenges

A large pot fleet with high crane frequency makes manual dispatch the bottleneck; cooling cycles fluctuate and upset downstream scheduling; safety demands every pot movement under control.

  • Fleet size and crane frequency bottleneck manual dispatch
  • Cooling-cycle variance disrupts downstream scheduling
  • High-temperature pot handling must be controlled end to end
03

Solution

An iteration on the Yunnan Copper yard: tracking, control and dispatch close the loop so pots move faster, cool on curve and are handled safer.

  • Smart trackingLive identity and position sensing with full movement traces
  • Cooling controlCooling curves logged automatically with completion checks and overdue alerts
  • Smart dispatchLifting order and yard allocation scheduled by temperature, cycle and destination
  • Safety interlockCritical states lock the handling flow and alarm, preventing unsafe tipping
04

On Site

Alerting & handling workflow
Alerting & handling workflow
05

Deployment Scope

  • Pot tags and yard reader stations
  • Smart management platform (track/control/dispatch)
  • Safety interlock and alert rule configuration
  • Data integration with smelter production systems
06

Results

Cooling cycles are down 4%+ with visibly faster yard turnover; every action is auditable and critical states auto-interlock, treating explosion risks at the source.

4%+Cycle time cut
2026Deployed
3Integrated capabilities
07

Related Products

Want a similar solution?

Talk to our metallurgical experts for a deployment plan tailored to your plant.

Contact Us →